Solutions

Built for
the Mission.

Whatever the gap, whatever the load — EasiBridge has a system your team can deploy without specialist engineers, without far-bank access, and without heavy plant.

Scroll

01 | 03

Military & defence

Assault, logistics, covert, UGV

01 | 03

Government & Emergency

Flood, rescue, blue-light

01 | 03

Civil & Humanitarian

NGO, remote access, post-conflict

01 | 03 — Military & Defence

Cross.
Deploy.
Advance.

Assault-rated bridging two soldiers can deploy without far-bank access, without specialist engineers, and without heavy plant. From 5m to 30m — under fire if necessary. 88% lighter than IAB. 10× lighter than Bailey.

8x

Lighter than IAB

10x

More compact than Bailey

600+

Kits — Ukraine conflict

DASA

Defence & Security Accelerator

USE CASES

Where It's Deployed.

01

Tactical Assault Crossing

Rapid crossing of rivers, canals, and wadis. Near-bank launch only — no far-bank exposure at any point.

EB100  ·  LADX Delta

02

Forward Logistics

Maintain supply lines across water obstacles. MLC40 at 12m without engineer unit support.

EB100 VEHICLE  ·  Pier Sets

03

Covert Operations

Two-man carry, no mechanical noise, no far-bank footprint. Leaves no trace on the objective side.

LADX Delta  ·  EB100 FOOT BRIDGE

04

UGV & Robotic Platforms

Purpose-built crossings for unmanned ground vehicles. 500kg–1.5Te payload.

LADX Delta UGV

05

Armoured Vehicle Launch

WAVLB on Wolfhound platform — bridge deployment under armoured protection. 12m, MLC40.

EB100 WAVLB

06

UGV & Robotic Platforms

Purpose-built crossings for unmanned ground vehicles. 500kg–1.5Te payload.

LADX Delta UGV

02 | 03 — Government & Emergency Services

Deploy.
Reach.
Rescue.

When floods cut communities off or structures collapse, blue-light teams need a bridge they can carry in one vehicle and deploy in under an hour. No cranage, no engineer, no far-bank access needed.

<1hr

Operational from single vehicle

30m

Max span — no far-bank access

3

Minimum crew — basic tools only

5 trays

Entire system flat-packed

USE CASES

Where It's Deployed

01

Flood & Disaster Response

Restore pedestrian and light vehicle access across collapsed or flood-damaged crossings. Deployable from a single transit vehicle.

EB100 Foot  ·  EB Responder

02

Search & Rescue Access

Fire, rescue, and USAR teams cross unstable ground, trenches, and collapsed structures safely.

EB100 Foot  ·  LADX Urban

03

Infrastructure Failure

Rapid replacement when a bridge or culvert fails unexpectedly. Operational in under an hour.

EB100 Vehicle  ·  EB100 Foot

04

CBRN & Hazmat Access

Establish safe crossing routes into contaminated zones without exposing personnel during setup.

EB100 Trolley Bridge

05

Border Force & Police

Rapid deployable access for border force and policing operations across water obstacles.

LADX Delta · EB100 Foot

06

Community Evacuation

Restore evacuation routes for cut-off communities. 30m span from a 3-person crew.

EB Responder 30M

03 | 03 — Civil & Humanitarian

Access.
Anywhere.
Always.

Air-portable and helicopter-slingable. EasiBridge gives aid organisations and construction teams permanent or semi-permanent access in the most remote, resource-constrained environments on earth.

90m

Max span on pier sets

Air

Helicopter-slingable

Semi-perm

Long-term installation capable

NO CRANE

No heavy plant required

USE CASES

Where It's Deployed

01

Humanitarian & NGO Access

Air-delivered to cut-off communities. Installed by a small team with basic tools — no cranage on site.

EB100 Foot  ·  EB Responder

02

Post-Conflict Infrastructure

Semi-permanent installation to restore civilian movement. Reusable, reconfigurable, and relocatable.

EB100 Vehicle  ·  Pier Sets

03

Remote Construction Access

Where conventional bridge construction is impractical — jungle, mountain routes, pipeline corridors.

EB100 Vehicle  ·  EB100 Foot

04

Medical Supply Routes

Reliable access for medical resupply and evacuation including light vehicle access for ambulances.

EB100 Vehicle  ·  EB100 Foot

05

Disaster Reconstruction

First-in access after earthquake, flood, or tsunami — before conventional reconstruction begins.

EB Responder 30M

06

Agricultural & Rural Access

Permanent or seasonal crossing for agricultural vehicles where conventional bridging is uneconomic.

EB100 Vehicle  ·  LADX Delta

Bridge Finder

Not Sure Which System You Need?

Tick your operational requirements and we’ll match you to the right bridge — span, load, pack format, and deployment constraints all factored in.

Your requirements
Span needed
What needs to cross?
How does it need to pack?
Deployment constraints
Operational context
Recommended systems
Tick one or more requirements to find your bridge.

Enquire

GET IN TOUCH

Whether you’re a military procurement officer, emergency services commander, or humanitarian organisation — we’ll find the right EasiBridge solution for your mission.

Scroll to Top