Solutions Civil & Humanitarian

Access.
Anywhere.
Always.

Modular, weld-free bridge. Flat-packs. Hand-launched to 30 m / 100 ft. No crane. No far-bank access.

Scroll

Our People

The Team

portrait silhouette

Andrew Gunn

CEO

Leading global strategy and business development

portrait silhouette

Stephen Bright

Founder

Doctoral specialist in lightweight bridge decks and founder of EasiBridge

portrait silhouette

Krzysztof Sokolowski

Head of Engineering

Responsible for the structural design and development of the product range

portrait silhouette

Nathan Ward

Head of Engineering

Oversees manufacturing, supply chain, and quality assurance 

portrait silhouette

John Doe

Sales

Manages relationships across the UK, Europe and international markets

why Easibridge

Built for the field,
not the factory.

The EB100 uses a patented cantilever-launch technique. Crew never sets foot on the far bank to put the bridge across.

01

No heavy plant required

Every component weighs under 20kg. The full system is carried, not craned. Field teams with basic tools can install a 30m bridge without specialist support.

02

Airideliverable

Helicopter-slingable and air-drop compatible. When road access doesn’t exist, EasiBridge goes in by air. Fits in standard cargo dimensions — C-130, CH-47, civilian helicopters.

03

No heavy plant required

Not just a temporary fix. EasiBridge installs as a semi-permanent structure — designed to withstand long-term use, seasonal flooding, and years of community traffic.

04

Reusable & relocatable

When a programme ends or priorities shift, the bridge comes with you. Modular aluminium components disassemble, pack down, and redeploy elsewhere — full asset recovery.

05

No far-bank access

The Cantilever Inversion Technique launches the bridge entirely from one bank. No personnel cross to the far side during installation — critical in flood or post-conflict conditions.t.

06

Rapid first response

A two-person team can restore a 20m crossing in under an hour from a single vehicle — before conventional engineering arrives. Access in the first 72 hours saves lives.

USE CASES

Where It's Deployed.

01

Post-Conflict Infrastructure

Restore civilian movement after conflict has destroyed bridge infrastructure. Semi-permanent installation that outlasts the programme — communities keep the bridge.

EB100 Vehicle  ·  Pier Sets

02

Disaster First Response

Earthquake, flood, or tsunami — restore access in the first 72 hours before conventional reconstruction begins. One vehicle, two crew, under an hour.

EB Responder 30M  ·  EB100 Foot

03

Remote Community Access

Helicopter-delivered to cut-off communities. Installed by a small NGO team with basic tools — connecting schools, clinics, and markets that were seasonally isolated.

EB100 Foot  ·  LADX Delta

04

Medical Supply Routes

Reliable vehicle access for medical resupply and patient evacuation — including ambulance-rated light vehicle crossing where previously only foot traffic was possible.

EB100 Vehicle  ·  EB100 Foot

05

Agricultural & Rural Access

Permanent or seasonal crossing for agricultural vehicles, produce transport, and rural communities where conventional bridge construction is economically unviable.

EB100 Vehicle  ·  LADX Delta

06

Pipeline & Utility Crossing

Access bridges for construction teams on pipeline, power, and water utility projects in remote terrain — installed and recovered without site damage.

EB100 Vehicle  ·  Pier Sets

 
 

Field Conditions

Designed for Where things Go Wrong.

For 100 ft (30m) spans, the Octet-Truss configuration allows direct integration of the launch nose into the main bridge framework. Bridges deploy as complete trackway pairs over a demountable, lightweight launch skate.

No road access to site

Helicopter-slingable. Air-drop compatible. When the bridge site has no road, the system goes in by air — full kit in standard cargo dimensions.

Flood & high water

CIT push-launch keeps all personnel on the home bank throughout deployment — no crossing required during installation, even in flood conditions.

No engineer support

Field teams with basic tools and standard training can install a full 30m bridge. No specialist contractor or Royal Engineer unit required.

Post-conflict durability

Stable, proven 6082-T6 aluminium construction — installed as a semi-permanent structure built to withstand years of community use without degradation.

In the field

Real-world scenarios.

01

EB100 Vehicle Bridge

30m  ·  MLC40

Vehicle and personnel crossing up to 30m. Push-launched from home bank. Entire 12m bridge in 0.8×2.0×1.5m — Foxhound or Humvee trailer. 10× lighter than Bailey.

View product

02

EB100 Footbridge

30m  ·  50kN/m²

Full 30m personnel bridge. 5 flat trays, 1.6×1.1×1.4m. Trays double as launch supports. Helicopter-slingable. 2–3 crew, basic tools.

View product

03

EB100 on Pier Sets

90m  ·  MLC40

Extended span to 90m without pontoon assets. Same modular components as EB100 — pier sets extend reach over wide rivers and valleys.

View product

04

EB Trolley Bridge 30M

30m  ·  1000kg

Ultra-portable emergency bridge. 5 trays flat-packed — each tray doubles as launch support and trolley. Single vehicle carry. 3-person deployment.

View product

05

LADX Delta

15m  ·  750kg

Bridge-in-a-Bag. 15m in 5 × 20kg duffel bags. Man-portable by two people — no vehicle needed. Fastest deploy in the range. Light vehicle and personnel crossing.

View product

Enquire

discuss your requirement.

Whether you need a bridge for a single community or a programme of deployments across a region — our engineers will specify the right system for your terrain, span, and logistics constraints.

Scroll to Top